Tuesday, January 9, 2024

WASTE RECEIVER TANK Design, Detail, & Install

 WASTE RECEIVER TANK Design, Detail, & Install

deandrafting@gmail.com

ALL SECTIONS OF WASTE RECEIVER TANK AND FRAME BOLT IN PLACE.

INSTALL ALL 4 LEGS (A) ONTO CONCRETE ANCHOR FOOTINGS WITH 'J' BOLTS THROUGH BOLT HOLES OF FOOTPADS.

MOUNT HORIZONAL BEAM (C) ACROSS 2 OF THE VERTICAL SUPPORT LEGS ON EACH SIDE AS SHOWN.

MOUNT OTHER 2 HORIZONAL BEAMS (C) WHERE INDICATED TO SUPPORT TANK BRACING BEAMS (H), WELDED ON TANK SECTION.

INSTALL 2 - 76.2mm HORIZONAL CROSS-BRACES (F) TO VERTICAL LEGS WHERE INDICATED.

INSTALL 8 - ANGLE IRON CROSS-BRACES BETWEEN VERTICAL LEGS AND HORIZONAL SUPPORT BEAMS.

INSTALL GASKETS AND THEN MOUNT BOTTOM CONE AND OTHER SECTIONS OF WASTE RECEIVER TANK.

DO NOT TIGHTEN BOLTS UNTIL ALL SECTIONS OF WASTE TANK ASSEMBLY ARE ASSEMBLED TOGETHER AS INDICIATED.











deandrafting@gmail.com

No comments:

Post a Comment

Chickroom Automation Proposal

 Used Poultry #Automation Equipment Chickroom Automation Proposal deandrafting@gmail.com #avicola #egg #poultry Used De-stacker Used 208v 3 ...